Prefabricated Living Unit 20FT Expandable Modular Shipping Container House for Construction Site
Construction Site Contractors Office Living QuartersThe total of the project is about 116 sets container house (about 21
Description
Basic Info
Model NO. | KHCD |
After-sales Service | Installation Guide |
Warranty | 1 Year |
Material | Container |
Usage | Dormitories, Temporary Offices, Camp, School, Hospital, Toilet |
Certification | ISO, CE |
Customized | Customized |
Color | Blue |
Size | 20FT/40FT |
Wall Material | Rock Wool Sandwich Panel |
Wall Panel | 50mm EPS/Rockwool/PU Sandwich Panel |
Door | Steel Door/Sandwich Panel Door |
Floor | Vinyl Sheet on Plywood or MGO Board |
Transport Package | 40FT Shipping Container House |
Specification | 20ft/40ft |
Trademark | K-HOME |
Origin | Henan, China |
HS Code | 9406900090 |
Production Capacity | 800PCS/Month |
Product Description
Construction Site Contractors Office Living QuartersThe total of the project is about 116 sets container house (about 2100 sqm), with business office area, leisure, living quarters, shop, catering functional areas, etc. The project is equipped with a basketball court (tennis/badminton court), pavilion, fountain, rockery, landscaping engineering, wooden corridors, intelligent engineering design. It adopts a symmetrical quadrangle design.1800sqm Prefab kit houses are used to the dining hall, large conference room, restroom, and bathroom. (Camp house)Conception: Green, Environmental Protection(1) Use the self-built water-cycling system. The collected rainwater, after processing, can be used as irrigation water or water for life.(2) Use water permeable bricks, without seeper on the ground.(3) Use solar energy for street lighting within the project area.Quantity: 148 units of flat pack container house (living quarters: 48 units, office area-1: 48 units, office area- 2: 20 units)If you want to order construction site workforce housing, kindly contact us, maybe we have the local agent or installation teams and could make the best solution with the best price and fast delivery service. Characters:1) Good ability to assemble and disassemble several times without damage.2) Could be lifted, fixed, and combined freely.3) Fireproof and waterproof.4) Cost saving and convenient transportation (Each 4 container houses can be loaded in one standard container)5) Service life can reach up to 15 - 20 years6) We can provide the service of installation, supervision, and training by extra.Technical Parameter:Wind Resistance: Grade 12Wall permitted loading:0.6KN/ m2Ceiling Permitted live loading:0.5 KN/m2Wall Coefficient of thermal conductivity: K=0.442W/MKCeiling Coefficient of thermal conductivity: K=0.55W/ m2KItem | Specification | |
Part 1 | Roof System | |
I. | Steel frame | The steel frame is Q235 galvanized fitting; |
Ii. | Roof insulation | The ceiling is blue color steel pre-coated 0.4mm outside strong steel sheet;With 50mm glass wool insulation material; |
Iii. | Roof ceiling | The ceiling is shaped steel plate with different pattern |
Part 2 | Floor System | |
I. | Steel frame | 3mm Galvanized Steel for main structure + 1.5mm square tube for the secondary beam |
Ii. | Floor | 15mm chipboard + PVC leather floor |
Part 3 | Column System | |
I | Column | 2.5mm Shaped Galvanized Steel |
Part 4 | Sandwich Wall System | |
I | Wall Panel | 50mm EPS Foam Sandwich Panel ;The outside color is light silver-gray (0.35mm thickness steel );Inside is white color steel (0.35mm thickness steel ). |
Part 5 | Door & window system | |
I. | Door | Material: Steel doorSize:2000*980mm(H*W) |
Ii. | Window | Material: Aluminum alloy steel double hollow glass sliding window (including screens)Size:1200*1000mm(H*W) |
Part 6 | Electric system | |
I. | Electric system | Includes ordinary LED light, A-SW double sockets 2set, A-SW air-switch 2 set,Electrical box with safety protection device connecting cable for connecting; |
Part 7 | Accessories | Electric wire; Sealant; Wiring tube; Screws and other accessories. |
PROJECT SHOWQ1: Can you accept the customized service and personalized design?
A: Yes, our professional engineer team can make a drawing by following customers' requirements.Q2: How to pay?
A: T/T will be more appreciated.30% deposit before producing,70% balance before loading.
Q3: How to install?
A: We will provide detailed installation videos and instructions to you. Technicians will be sent to help you on-site if necessary. However, the visa fee, tickets, accommodation, food, and wages will be under-taken by buyers.
Our Contact
Send now