banner

Products

Construction Cuplock Aluminum Frame Steel System Kwikstage Ringlock Formwork Scaffold

Construction Cuplock Aluminum Frame Steel System Kwikstage Ringlock Formwork Scaffold

Scaffolding one-stop Solution China Wuxi Total Scaffolding Manufacturer. Wuxi factory and Tangshan FactoryMain products:
SHARE

Description

Basic Info
Model NO. model A
Material Steel
Type Fixed
Structural Style Multi-Pole Scaffolding
Framework Combined Scaffolding
Supporting Mode Projecting Scaffolding
Lapping Form Full Scaffolding
Erection Position External Scaffolding
Move Method Attached Lifting Scaffolding
Scaffolding Part Type Scaffolding Planks
Construction Properties Installation Scaffold
Materials Q235/Q355 Strength Steel
Certificate ISO, CE, SGS
Function External, Supporting
Structure Multidirectional Type
Surface Hot DIP Galvanized
Manufacturability 30 Containers/Month
Transport Package Steel Frame
Origin Wuxi, China
HS Code 73084000
Production Capacity 100 Tons Per Day
Product Description
Scaffolding one-stop Solution
China Wuxi Total Scaffolding Manufacturer. Wuxi factory and Tangshan FactoryMain products: Ringlock, Cuplock, Octagonlock, Kwikstage, Frame, Haki, Aluminum tower, Shoring prop, Couplers.
Instrument and equipment
Ringlock scaffolding is a mature system. It mainly composes of standard, ledger, brace, plank and so on.
Ringlock node is revolutionary, so makes it faster and easier erection than any other scaffolding. When it comesto connect way, it uses the wedges, ledger end and rosette to lock the vertical and horizontal together by hitting the wedges. The rosette have eight holes, four fix ledger and four fix brace, much better than other scaffolding. Each ledger and brace is independent. So it can make the ledger and brace quick locking and fastening tightly.

Technicial parameter
Item NameMaterialsWeightSurface treatment
Standard/verticals 050Q235, Q35548.3*2.75mm48.3*3.0mm48.3*3.2mm2.96kgHot dip galvanizedPowder coatedPainted
Standard/verticals 1005.33kg
Standard/verticals 1507.69kg
Standard/verticals 20010.06kg
Standard/verticals 25011.86kg
Standard/verticals 30014.78kg
Item NameMaterialsWeightSurface treatment
Ledger/Horizontal 073Q235, Q35548.3*2.75mm48.3*3.0mm48.3*3.2mm3.34kgHot dip galvanizedPowder coatedPainted
Ledger/Horizontal 10904.52kg
Ledger/Horizontal 14005.53kg
Ledger/Horizontal 15706.09kg
Ledger/Horizontal 20707.73kg
Ledger/Horizontal 25709.37kg
Ledger/Horizontal 307011.01kg
Item NameMaterialsWeightSurface treatment
Diagonal/brace 073*200Q235,48.3*2.5mm5.34kghot dip galvanizedPre-galvanized
Diagonal/brace 109*2005.81kg
Diagonal/brace 140*2006.23kg
Diagonal/brace 207*2007.56kg
Diagonal/brace 257*2008.39kg
Diagonal/brace 307*2009.22kg
Item NameMaterialsWeightSurface treatment
steel plank/deck 1090Q235, 1.2mm1.5mm,1.8mm8.58kgHot dip galvanizedPre-galvanized
steel plank/deck 140010.85kg
steel plank/deck 157012.48kg
steel plank/deck 207015.65kg
steel plank/deck 257018.91kg
steel plank/deck 307022.15kg
Item NameMaterialsWeightSurface treatment
Hop upsl/bracket 1Q235,48.3*3.2mm2.5kgHot dip galvanizedPowder coatedPainted
Hop upsl/bracket 26.0kg
Hop upsl/bracket 39.0kg
Cuplock scaffolding
Kwikstage scaffolding

Construction Cuplock Aluminum Frame Steel System Kwikstage Ringlock Formwork Scaffold


Frame scaffolding

Construction Cuplock Aluminum Frame Steel System Kwikstage Ringlock Formwork Scaffold


Shoring propAluminum scaffolding tower

Construction Cuplock Aluminum Frame Steel System Kwikstage Ringlock Formwork Scaffold

Construction Cuplock Aluminum Frame Steel System Kwikstage Ringlock Formwork Scaffold


Scaffolding Project Case

Construction Cuplock Aluminum Frame Steel System Kwikstage Ringlock Formwork Scaffold


Load test

Scaffolding Certificate

1. Q: What is your product range?
A: Ringlock, Cuplock, Frame, Couplers, aluminum scaffolding tower, scaffolding accessories.
Q: What is MOQ?
A: Usually we don't have a MOQ, but it depends on the product you are looking for.

2. Q: What kind of payment term do we accept? A: West Union, T/T and L/C.
Q: Can I get samples? Yes, we offer free samples on most itmes if it is not too heavy or big. freight collect
Q: How is your factory's production capacity?
A: Over 500 tons per month.

3. Q; Where have you been exported? We have exported to Asia, South Ametica, Europe, Africa and Middle east.
Q: What kind of international certificate do we offer?
A: CE certificate and SGS test report.
Q: How can you assure the welding quality? A: We have made the flaw detection test which can prove the good welding quality.

4. Q: What is production time? Usually it takes 25-30 days for the first container,production goes faster after the first container once
all raw materials are ready.The more the faster. Partial shipment can be arranged if requested.

5.
Q: How does your factory control quality?
A: Our strict quality control system ensures all products well made step by step. All the raw materials are bought from professional
steel manufacturers, with Mill Test Certificates offered. Our quality control persons inspect and monitor the whole process from
raw material, cutting, pressing, welding, matching, surface finish, finishing process, packing, container loading and transportation.

6.
Q: How is the bearing capacity of your scaffolding?
A: It depends on which kind of scaffolding, scaffolding sizes, and the setup plan. We have many test reports for your reference.

7.
Q: How High can your scaffolding reach to?
A: Normally, we suggest our client to setuo the scaffolding maximum reach to 30 meters. But some of our customers setup our
scaffolding reach to 50 meters. According to safety documents, every 20 meters, we need to make a steel platform where the
scaffolding can be setup continually.

8.
Q: What is your after-sale service? A: All the after-sale problems will be solved based on mutual friendly communication.
In case of quantity shortage,the detailed certificates should be sent to our side in seven days after the goods arrive at your
warehouse. In case of quality discrepancy,such as problems caused by raw material,welding,or surface finish,the detailed
certificates should be sent to our side.If it is confirmed caused by our side for the above two mentioned situations,the loss
will be compensated as the new goods sent to your side in next order.

Our Contact